more formattting

This commit is contained in:
Jon Sands 2018-07-24 00:27:36 -04:00
parent 22406a8e14
commit f4087832fd

View File

@ -35,7 +35,6 @@ On an LB6M, the connection should look like this:
Now that everything is plugged in and the BDI2000 is powered, power up the switch. Now that everything is plugged in and the BDI2000 is powered, power up the switch.
**Startup Order Summary:** **Startup Order Summary:**
1. Connect ethernet to the BDI2000 1. Connect ethernet to the BDI2000
2. Connect the power brick to the BDI2000 2. Connect the power brick to the BDI2000
3. Connect the BDI2000 to the switch JTAG header 3. Connect the BDI2000 to the switch JTAG header