Commit Graph

14 Commits

Author SHA1 Message Date
Sekwah
beee5e09dd chore: pre-commit cleanup 2023-11-22 00:25:59 +00:00
Sekwah
edfbb713c6
feat: portal block placing checks surrounding blocks for orientation
Also moved data to be serializeddata
2023-05-14 21:31:17 +01:00
Sekwah
7414f21794
feat: portal placer block rotate tool 2023-05-14 21:12:18 +01:00
Sekwah
c861333304
fix: remove references to old material + make translatable 2023-04-12 15:24:42 +01:00
Sekwah
c446c1602a
feat: make services available as singletons 2023-04-12 03:08:47 +01:00
Sekwah
4f78ef1578
feat: add portal and desti commands 2023-04-07 02:09:48 +01:00
Sekwah
9545f75a46
feat: add basic data loading and translations 2023-04-07 00:05:54 +01:00
Sekwah
9cd721fb0f
chore(ci): remove paper running plugin, switch out for a direct download/configure script so it can be easily tested on spigot, forge and the proxies 2022-04-24 03:38:04 +01:00
Sekwah
47ca225be7
refactor: reorganise the package structure 2022-04-23 16:07:16 +01:00
Sekwah
b63169ca58
feat: register basic bungee plugin with metrics 2022-04-23 02:50:11 +01:00
Sekwah
fd49023788
chore(ci): adding run-paper plugin for easy testing on paper 2022-04-23 02:31:37 +01:00
Sekwah
ce94280b45
Re-organising structure 2021-05-25 01:32:22 +01:00
Sekwah
2d9a24716e
Removing everything preparing for re-code.
Sorry in advance for any mess with this part. Setting up a project from the get go I am not sure how to follow the commit structure as easily as I jump around a bit. Once we have some structure ready or planned out I will be following the standards we put back in place.
2021-05-24 00:19:14 +01:00
Sekwah
2c5b124cae
build: Rearrange to multi project build 2021-05-23 22:18:47 +01:00