Test 5-06 - OVA Configuration

Purpose:

To verify that the settings of an OVA version of Harbor can be configured and re-configured after power-on/off.

References:

User guide, Installation guide of Harbor OVA version.

Environment:

  • This test requires an OVA binary of Harbor.
  • A vCenter, at least an ESX host, and a network that supports DHCP.
  • A linux host with Docker CLI installed (Docker client).

Test Steps:

To-Do:

  1. verify all setttings work at initial import
  2. verify all settings work after a hard power off followed by a power on
  3. Verify all settings can be changed as needed. (except networks, root password, Harbor password , mysql password)

Expected Outcome:

TBD

Possible Problems:

None