This guide is for Harbor upgrade test
|
|
=======
|
|
|
|
# Before upgrade
|
|
|
|
## Prepare data
|
|
1. Add user usera userb userc userd usere, set usera userb as system admin.
|
|
2. Create project projecta projectc as private, create projectb as public.
|
|
3. Add usera as projecta's admin, userc as developer, and userd as guest. Do the same to projectb and projectc.
|
|
4. Login harbor as usera, push an unsigned image into projecta, then push a signed image to projecta.
|
|
5. Login harbor as userc, push an unsigned image into projecta, then push a signed image to projeca.
|
|
6. Login harbor as userd, push each image one time.
|
|
7. Repeate 4 5 6 to projectb and projectc.
|
|
8. Add one endpoint to harbor.
|
|
9. Add an immediate replication rule to projeca, a schedule rule to projectb, a manual rule to projectc, trigger each rule one time.
|
|
10. Add 5 system label syslabel1 to syslabel5 and tag syslabel1 and syslabel2 to all unsigned image.
|
|
11. In each project add 5 project label projlabela to projlabele, add projlabela projlabelb and projlabelc to signed image.
|
|
12. Trigger one scan all job to scan all images.(For clair enabled instance)
|
|
13. Update project publicly, content trust, severity and scaning settings.
|
|
14. Update Harbor email, token expire read only and scan settings.
|
|
15. Update repository info.
|
|
**NOTE**: Create user step is not needed if auth mode is LDAP.
|
|
|
|
# Upgrade
|
|
|
|
## Follow the upgrade guide
|
|
1. Run db migrator image to backup database.
|
|
2. Run db migrator image to migrate database.
|
|
3. Install new version harbor.
|
|
|
|
# After upgrade
|
|
|
|
1. Confirm users are exist and available(No need for VIC and LDAP Mode).
|
|
2. Confirm users have the correct role.
|
|
3. Confirm labels are existing and labeled correct.(No need for VIC)
|
|
4. Confirm notary signature correct.
|
|
5. Confirm endpoint exist.
|
|
6. Confirm replication rule exist and works well.
|
|
7. Confirm project level settings(publicly, content trust, scan) same as before.
|
|
8. Confirm system level settings(email token expire scan) same as before.
|
|
9. Confirm scan result the same as before upgrade.
|
|
10. Confirm access log the same as before upgrade.
|
|
11. Confirm repository info the same as before.
|
|
12. Confirm other image metadata(e.g. author, size) the same as before.
|